Skip to content
1 (438) 800-0382FR FrançaisGet a quote

Three-phase UPS service

Data-centre UPS service across Canada

Maintenance, battery testing, installation and repair. A written method before work, recorded readings and a report after.

APC · Eaton · Vertiv · XPC

Explore three-phase UPS

APC, Eaton, Vertiv and XPC. Match your nameplate to a researched family, then plan maintenance or replacement.

Explore three-phase UPS
APC / Schneider Electric Galaxy VS

Battery testing or replacement

Plan battery replacement

Investigate declining runtime or plan a string replacement.

Plan battery replacement
Equipment illustration

Manufacturer image; configuration may vary. Selected regional variants. Exact configuration and availability confirmed for each request.

Explore three-phase UPS models

APC, Eaton, Vertiv and XPC. Match your nameplate to a researched family, then plan maintenance or replacement.

Browse the model library

Published range. Manufacturer image; configuration may vary.

Selected regional variants. Exact configuration and availability confirmed for each request.

How quickly we respond

4 h Reply and quote: within 4 business hours

Same day Same day: Montreal, Quebec City, Toronto, Ottawa

24 to 48 h Elsewhere in Canada: 24 to 48 hours

24/7 Emergency line: 24/7

Plan service or testing

Find the work your UPS needs

Start with the purpose of the visit. The scope is confirmed against your equipment and site.

Scheduled UPS maintenance

Define the next maintenance visit.

Scope to confirm
Inspection, operating readings, battery checks and findings against the previous visit.
Have ready, if known
UPS model and rating, last report, battery age and permitted service window.

Battery testing or replacement

Investigate declining runtime or plan a string replacement.

Scope to confirm
Ohmic trends, capacity testing where specified, replacement scope and disposal requirements.
Have ready, if known
Battery model, number of strings, installation date and required runtime.

A maintenance contract

Set the visits, reports and response terms in writing.

Scope to confirm
Equipment schedule, preventive visits, battery scope, parts and call-out terms.
Have ready, if known
Equipment list, existing agreement, access hours and reporting requirements.

A load bank test

Check the power train under a defined artificial load.

Scope to confirm
Connection point, load steps, hold times, transfers and recorded output readings.
Have ready, if known
UPS rating, single-line diagram, bypass arrangement and test window.

Installation and commissioning

Prepare a documented handover for a new or moved UPS.

Scope to confirm
Site checks, startup procedure, functional tests and acceptance records.
Have ready, if known
Model, electrical supply, room access, load and target commissioning date.

Replacement planning

Assess an ageing system before committing to its replacement.

Scope to confirm
Equipment condition, support status, load, redundancy and replacement constraints.
Have ready, if known
Equipment inventory, recent faults, load profile and planned growth.

Thermography and power quality

Investigate hot connections or supply disturbances.

Scope to confirm
Infrared findings and power-quality measurements within an agreed scope.
Have ready, if known
Symptoms, circuit information, operating load and previous readings.

What keeps a data-centre UPS ready

A data-centre UPS stays ready with scheduled maintenance, batteries tested on a schedule, a load test from time to time, and a plan for the day it reaches end of life. Vertiv's reliability analysis indicates that UPS receiving two preventive maintenance visits a year have a mean time between failures 23 times higher than UPS with none. The services cover maintenance, battery testing and replacement, installation and commissioning, contracts, repair and replacement planning, and every figure quoted here links to the manufacturer document or standard it comes from.

See the maintenance scope

Fig. 1 · Where a maintenance visit looks

Where a maintenance visit looks A UPS cabinet and its battery cabinet with numbered callouts in the order of the visit: 1 alarm and event log; 2 filters, fans and vents; 3 input, output and bypass values; 4 every battery block; 5 connections scanned for heat; 6 capacitors and modules against their service life. UPS cabinet Battery cabinet Alarm and event log 1 Filters, fans and vents 2 Input, output and bypass values 3 Connections scanned for heat 5 Capacitors and modules against their life 6 Every block 4
The numbered callouts follow the order of a maintenance visit.
See the maintenance scope

All 7 services

Load bank testing

Load bank testing

Fig. 2 · Load steps and hold times

Load steps and hold timesA step chart of load on the UPS output against time: 50% load held for one hour, then 100% load held for three hours.Load on the UPS outputTime50%one hour100%three hoursThen: battery discharge, repeated transfers, loadremoved.
Load steps from Eaton's UPS load bank procedure; the maker's method for each model sets its own. Source: Eaton, Load Bank Testing Scope of Work (Attachment L-6)

Fig. 3 · Load bank test power path

Load bank test power pathThe supply feeds the UPS rectifier and inverter; the inverter output feeds the load bank; the critical load is carried on the maintenance bypass from the supply, outside the UPS.SupplyUPS under testRectifierInverterBatteryLoad bankTest loadMaintenance bypassCritical load
During the test the critical load runs on the maintenance bypass (dashed) and the load bank is connected to the UPS output, so the test load never reaches the protected equipment.

What a load bank test proves

A load bank test proves that the UPS carries a known load at each step and keeps its output in order while it does, with the protected equipment on a separate path. In Eaton's published UPS method the load runs at 50% for one hour and at 100% for 3 hours, followed by a short battery discharge and repeated transfers, and a report documents the results.

What it does not prove

A load bank test does not prove battery runtime; that takes a capacity test. Start with load bank testing, or go straight to what a load bank is.

Load bank testing, explained

How a job runs

  1. You tell us the site, the UPS make and size if known, the service and the timing.
  2. We reply and quote within 4 business hours.
  3. A written method is agreed before the visit: what is checked, how the load is protected, who signs off.
  4. The work follows the maker's procedure for your model, with readings recorded as they are taken.
  5. The report sets out findings, readings against the last visit, work done and what comes next.

More on how we work, or contact us for an emergency.

The report

Report layout, example

Site
UPS
Date
Method
Step% loadDurationVAHz°C
FindingsOKWatchAct

Report layout, example. Values are recorded on site.

  • Equipment: UPS model, serial number, firmware, configuration and battery strings
  • Method: The procedure followed, the load protection used and who signed off each step
  • Readings: Input, output and bypass values; battery readings per block; temperatures
  • Load steps: Each step applied in a load test, its duration and what was measured
  • Thermal findings: Hot spots with their temperatures and a thermograph of each
  • Findings: What is out of range, why it matters and how urgent it is
  • Next steps: Work recommended, components near end of life, the date of the next visit

Engineering guides

All 14 guides

The room around the UPS

Explore power distribution, monitoring, cooling, fire protection and contamination control. Each topic connects back to the UPS and battery system.

Questions

Which UPS do you service?

Three-phase UPS from the main makers in data centres, server rooms, hospitals and industrial sites, all brands. Brand names identify equipment only; we are not the manufacturer.

Where do you work?

Across Canada: the same day in Montreal, Quebec City, Toronto and Ottawa, and within 24 to 48 hours at other Canadian sites, with an emergency line that is answered around the clock.

How quickly do I get a quote?

Within 4 business hours of your request.

Is load bank testing the same as battery testing?

No. A load bank test proves the UPS power train at known load steps; battery runtime is proven by a capacity test. See UPS and battery testing.

Sources, checked 2026-10-04:

Need a UPS serviced, tested or replaced?

Tell us the site, the UPS and the timing. We reply and quote within 4 business hours, or call 1 (438) 800-0382

Timing

We reply and quote within 4 business hours.

More details
Call 1 (438) 800-0382Get a quote