UPS battery replacement and testing
UPS battery testing shows which blocks are drifting and whether the string can still carry the load for the runtime the site needs. The readings decide when the string is replaced, before it fails.

Equipment illustration
Battery testing or replacement
Prepare a service request
Investigate declining runtime or plan a string replacement.
Scope to confirm
Ohmic trends, capacity testing where specified, replacement scope and disposal requirements.
Have ready, if known
Battery model, number of strings, installation date and required runtime.
Send what you know. The equipment and access details can be confirmed after the first contact.
Key facts
- Real VRLA life in UPS use:
- Replaced every four to five years on average, though often sold with a 10-year design life (Eaton)
- Recommended VRLA replacement:
- 4 years on average, 5-year service life (Eaton aging-UPS table)
- Best battery temperature:
- 25 °C, held within plus or minus 5.5 °C (C&D)
- Ohmic trend limits:
- A change under 20% is acceptable; over 50% needs further attention such as a load test (C&D)
- Ohmic reading interval:
- Quarterly, as IEEE-1188 recommends (EnerSys)
- Share of UPS cost:
- The battery often accounts for 30% of the cost of the UPS (Eaton)
4 h Reply and quote: within 4 business hours
Same day Same day: Montreal, Quebec City, Toronto, Ottawa
24 to 48 h Elsewhere in Canada: 24 to 48 hours
24/7 Emergency line: 24/7
When Is a UPS Battery String Due for Replacement?
When a battery string is due
Short answer
A string is due when its readings trend out of limits across many blocks, or when a capacity test falls short of the runtime the site needs. C&D's VRLA manual gives the rule for internal ohmic readings (conductance, impedance or resistance) taken on every block: a change over time of less than 20% is acceptable, a change of more than 50% needs further attention, such as a load test.
Eaton's battery paper notes that VRLA batteries are often sold with a 10-year design life, yet in UPS use they are replaced every four to five years on average; its aging-UPS table puts the recommended VRLA replacement at 4 years and the service life at 5.
- Within the trend
- Above it
Steps of a battery test visit
- What happensVisual inspection of jars, covers and connectorsWhat is recordedBulging, corrosion, heat damage
- What happensMeasure total float voltage and currentWhat is recordedString values against the maker's figures
- What happensRead each block: voltage, ohmic value, terminal temperatureWhat is recordedPer-block readings and their change since the baseline
- What happensMeasure connector resistanceWhat is recordedConnections above the average of similar ones
- What happensMeasure AC ripple where possibleWhat is recordedRipple current or voltage
- What happensCapacity test, when the trend or the plan calls for oneWhat is recordedDischarge rate, time to end voltage, capacity found
- What happensReplace the string, when dueWhat is recordedNew baseline readings for every block
Causes of early battery failure
Heat, charging and frequent discharges shorten battery life. C&D recommends a battery room at 25 °C, within plus or minus 5.5 °C, as the best combination of performance and life; Schneider Electric's manual lists elevated ambient temperature, poor utility power and frequent short discharges as causes of shorter battery life. On charging, Eaton notes that a battery held on constant float for months is fed trickle-charge energy it does not need, which slowly corrodes the positive grid and shortens its float life. See the UPS battery life guide for each factor.
Ohmic tests and capacity tests
An ohmic test is a quick reading on each block that shows change over time; a capacity test discharges the string at a set rate to prove what it can deliver. EnerSys recommends ohmic readings at quarterly intervals, following IEEE-1188, and gives a capacity test procedure (or the IEEE one) for proving capacity. The ohmic trend shows which blocks to watch and when a capacity test is due; the capacity test measures runtime. A UPS load bank test proves the UPS itself, and its short battery discharge does not measure runtime; see UPS and battery testing.
Battery replacement
A planned replacement keeps the load protected, follows the maker's procedure for the UPS and the battery, and ends with readings that become the new baseline. The method covers how the load is protected while the string is out, matching the new blocks to the UPS's DC voltage and runtime, torque values for the connections, and recycling of the old blocks. Replacement cartridges for rack and tower Smart-UPS units are listed among these Smart-UPS replacement batteries; why the battery is the part that fails first is explained in the UPS battery as the critical component.
Readings at every battery check
- Total float voltage and float current of each string.
- Voltage, ohmic value and negative-terminal temperature of every block.
- Connector resistance; C&D flags any connection more than 10% above the average of similar ones.
- AC ripple current or voltage, where it can be measured.
- Visual condition: bulging jars, corrosion, heat damage at jars, covers and connectors.
- Room temperature, and the comparison with the baseline and the last visit.
Report layout, example
| Block | Voltage (V) | Ohmic value | °C |
|---|---|---|---|
Report layout, example. Values are recorded on site.
Questions
How long do UPS batteries last?
VRLA batteries in UPS service are replaced every four to five years on average, by Eaton's data, even when sold with a 10-year design life. Heat, charging and frequent discharges shorten that.
How often should UPS batteries be tested?
Ohmic readings quarterly, as IEEE-1188 recommends; float readings monthly; cell voltages twice a year; and a capacity test when the trend or the maintenance plan calls for one.
Can one bad block be replaced instead of the string?
Sometimes, on a young string with one early failure. On an older string, a new block among aged ones tends to be overcharged or undercharged, so the decision is made from the readings.
What runtime will I get?
A capacity test answers that for your string. For a first estimate, use the runtime calculator, then the maker's runtime table.
Sources, checked 2026-10-04:
- Manual C&D Technologies, msEndur II VRLA batteries installation and operating manual RS02044/0418, p. 6-25
- Manual EnerSys, VRLA battery systems safety, storage, operating and maintenance manual US-VR-OM-002 (March 2008), p. 6-35
- White paper Eaton, ABM technology and battery testing in Eaton UPS products (white paper AP162001EN)
- White paper Eaton, Your aging three-phase UPS: when to refresh, replace or run to fail (white paper WP161005EN, October 2021)
- Manual Schneider Electric, Smart-UPS On-Line SRT2200XLA/SRT3000XLA operation manual, p. 4
- White paper Vertiv, The effect of regular, skilled preventive maintenance and remote monitoring on critical power system reliability (white paper), p. 2
- Reference Eaton, Top five UPS components that require preventive maintenance
Need a UPS serviced, tested or replaced?
Tell us the site, the UPS and the timing. We reply and quote within 4 business hours, or call 1 (438) 800-0382