Monitoring tells you that something in the power path or the room has drifted before it becomes an outage. In a data centre or server room the UPS and its batteries come first, because they are what carries the load when the utility fails; the room around them comes next. This section explains what to watch, how alarms reach people, how DCIM and BMS differ, and how PUE is measured.

Key facts

Why start monitoring with the UPS and its batteries?

Because the battery is where most UPS failures begin. Vertiv states that approximately 37 percent of all UPS system failures are battery related, and that ongoing remote monitoring of UPS and battery health improves availability by detecting and correcting problems early. In its reliability study, sites whose batteries were professionally maintained and remotely monitored had zero outages due to bad batteries. A UPS already measures a great deal on its own: Schneider Electric's paper on physical threats notes that UPS systems monitor power quality, load and battery health. The gap is usually not the measurement but the path from the alarm to a person who knows what to do with it.

That is why the pages here start from the remote UPS monitoring and alarm response service and the battery monitoring systems that read every block, then widen out to the room.

What else in a server room should be monitored?

Temperature at the rack inlets, humidity, water leaks, doors and smoke, in that rough order of how often they cause trouble. Schneider Electric's guidance puts temperature sensors at the top, middle and bottom of each rack front, a humidity sensor in each cold aisle, leak rope around each cooling unit and under raised floors, and a switch on every entry door. The server room monitoring guide covers each sensor, where it goes and what threshold to start from, including the ASHRAE recommended range of 18 to 27 °C at the equipment inlet.

How do DCIM and BMS fit together?

A BMS runs the building and its mechanical plant; DCIM manages the data centre's physical assets, capacity and power down to the rack. Both can read the same UPS through its network card, using different protocols. The DCIM vs BMS comparison explains which system should own which alarm, and why a UPS alarm should reach someone directly even when both systems exist.

Where does PUE come in?

PUE is the efficiency figure that monitoring makes possible: total facility energy divided by the energy delivered to IT equipment. The Green Grid's most basic measurement level reads the IT load at the UPS output, so the UPS is again the starting point. See PUE explained, with a worked example for the formula, the three measurement levels and what a figure such as 1.26 really says.

How is a monitoring set-up quoted?

It is quoted with the UPS work it protects. Sensor installation and DCIM or BMS integration are delivered through specialist subcontractors, under one quote and one point of contact with the UPS and battery service. The quote lists the points monitored, the thresholds, who receives each alarm and what happens next. Send the UPS models, the number of battery strings and the room layout through the quote request.

In this section

Related pages

Questions

What should be monitored first in a data centre?

The UPS and its batteries. Vertiv puts approximately 37 percent of UPS system failures down to the battery, and the UPS is what carries the load when the utility fails. Room temperature, humidity, leaks and doors come next.

Does a UPS not monitor itself?

It measures power quality, load and battery health, but its alarms are only useful when they reach someone who can act. Remote monitoring closes that gap.

Is monitoring sold on its own?

It is quoted with the UPS and battery service it protects, so alarms lead straight to a response. Sensor installation and DCIM or BMS integration are delivered through specialist subcontractors.

Do I need DCIM to monitor a server room?

No. A small room can be covered by the UPS network card, a few sensors and alert routing. DCIM earns its cost when there are many racks, capacity questions and several systems to bring together.

Sources, checked 2026-10-04:

Need a UPS serviced, tested or replaced?

Tell us the site, the UPS and the timing. We reply and quote within 4 business hours, or call 1 (438) 800-0382

Request a quote →

Brand names are trademarks of their owners and are used only to identify the equipment we service. We are not the manufacturer and are not affiliated with it.

Call 1 (438) 800-0382Request a quote