Skip to content
1 (438) 800-0382FR FrançaisGet a quote

Services

UPS maintenance contracts

A UPS maintenance contract fixes, in writing, how often the UPS is maintained, how fast someone responds when it fails, what is included and what the reports show.

Equipment illustration

A maintenance contract

Prepare a service request

Set the visits, reports and response terms in writing.

Scope to confirm

Equipment schedule, preventive visits, battery scope, parts and call-out terms.

Have ready, if known

Equipment list, existing agreement, access hours and reporting requirements.

Send what you know. The equipment and access details can be confirmed after the first contact.

Get a quote for this workUse the form below

Key facts

Visits that change reliability:
Two preventive visits a year: MTBF 23 times higher than with none (Vertiv)
Battery monitoring:
On-site monitoring of the battery strings more than doubles MTBF for battery-related outages, versus maintenance alone (Vertiv)
Annual maintenance:
VRLA battery systems need annual preventative maintenance by a trained technician (EnerSys)

4 h Reply and quote: within 4 business hours

Same day Same day: Montreal, Quebec City, Toronto, Ottawa

24 to 48 h Elsewhere in Canada: 24 to 48 hours

24/7 Emergency line: 24/7

UPS Maintenance Contracts

What a contract should include

Short answer

The equipment covered, the visits, battery testing, response times, parts and labour, the reports and the exclusions, each set out in writing.

  • Equipment list: each UPS, battery string, bypass cabinet and distribution unit covered, with model and serial number.
  • Visits: how many per year, what each one checks, and which readings are recorded.
  • Batteries: how often they are read and tested, and how replacement is handled and priced.
  • Response: the time to answer a call, the time to be on site, and the hours that apply.
  • Parts and labour: what is included, what is quoted separately, and how parts availability is handled for older models.
  • Reports: what each report contains and when it is delivered.
  • Exclusions: listed in writing.

Fig. 1 · What a maintenance contract covers, and when

What a maintenance contract covers, and whenA matrix of scope against timing: full maintenance and readings at each full visit; battery readings at each visit and between visits; a thermal scan at each visit; emergency response on call; a report after each visit and each call.EachfullvisitBetweenvisitsOn callMaintenance andreadingsBattery readingsThermal scanEmergencyresponseReport againstthe baselineVisits per year, battery tests and scans are agreed persite.
Vertiv's research supports at least two maintenance visits a year; the schedule and response terms are written for each site.

Setting up a contract

  1. What happensSite survey: every UPS, battery string and bypass is listed
    What you receiveThe equipment list with models and ages
  2. What happensBaseline visit: full maintenance and battery readings
    What you receiveThe baseline report and any urgent findings
  3. What happensSchedule agreed: visits, battery tests, thermal scans
    What you receiveA calendar for the year
  4. What happensResponse terms agreed for each site
    What you receiveResponse times and the emergency line in writing
  5. What happensEach visit reported against the baseline
    What you receiveTrends, open items and a replacement outlook

Contract reports

Report layout, example

Site
UPS
Date
Method
  • Visual check and cleaning
  • Filters, fans and capacitors
  • Battery readings
  • Connections
  • Alarms and event log
  • Transfer readiness
FindingsOKWatchAct

Report layout, example. Values are recorded on site.

  • Equipment list: Every UPS, battery string and bypass covered, with model and age
  • Baseline: The first full readings, which every later visit is compared with
  • Each visit: The checklist, the readings and the trends against the baseline
  • Outlook: Open items and a replacement outlook for each unit

Visits per year

For a critical UPS, Vertiv's research supports at least two preventive maintenance visits a year, with battery readings in between. Vertiv's reliability analysis indicates that UPS with two preventive visits a year have an MTBF 23 times higher than UPS with none; separately, for battery-related outages, on-site monitoring of the battery strings more than doubled the MTBF over maintenance alone. EnerSys's VRLA manual requires annual preventative maintenance by a trained technician and quarterly ohmic readings, and Eaton's guidance adds monthly filter checks and quarterly thermal scans; the contract should say which of these it covers.

End of support

Coverage narrows as a model moves through its support stages, and the contract should say how. Eaton's end-of-service-life table lists the stages: active full support, then mature with best-efforts parts and product replacement recommended, then retired with no contract coverage and only time-and-materials service, then obsolete with no service or parts. A contract on an older UPS should state which stage the model is in, how parts are sourced, and what happens if a part cannot be found; see modernization and replacement planning.

Comparing two offers

Compare offers on the same equipment list and the same questions: visits per year and what each covers, battery testing included or extra, response time to site and the hours it applies, parts and labour included, emergency calls included or billed, and what the report contains. Makers frame their own programmes this way; Tripp Lite describes its service as covering the UPS from initial startup to annual service agreements and preventive maintenance.

Our contracts

We write maintenance contracts for three-phase UPS of every major brand, with the visits, battery testing, response times and reports set out in writing for each site. Quotes go out within 4 business hours. A technician reaches sites in Montreal, Quebec City, Toronto or Ottawa the same day, and other Canadian sites within 24 to 48 hours; the emergency line is answered around the clock. For a contract built around scheduled visits, see a preventive maintenance contract for UPS fleets.

Questions

Does a contract include battery replacement?

The contract should say which. Battery testing can be included; replacement is quoted when due, because its cost depends on the string.

Can one contract cover several sites and brands?

Yes. Each site keeps its own equipment list, schedule and response terms.

What if my UPS model is no longer supported by its maker?

The contract states how parts are sourced and what happens if one cannot be found, and the reports track a replacement plan.

How quickly do I get a quote?

We reply and quote within 4 business hours.

Sources, checked 2026-10-04:

Need a UPS serviced, tested or replaced?

Tell us the site, the UPS and the timing. We reply and quote within 4 business hours, or call 1 (438) 800-0382

Timing

We reply and quote within 4 business hours.

More details
Call 1 (438) 800-0382Get a quote