Skip to content
1 (438) 800-0382FR FrançaisGet a quote

Services

Data-centre UPS services

Maintenance, testing, installation and repair for three-phase UPS systems in data centres, server rooms and industrial sites across Canada, all brands. Every visit follows a written method and ends with a report you can file.

Equipment illustration

Plan service or testing

Find the work your UPS needs

Start with the purpose of the visit. The scope is confirmed against your equipment and site.

Scheduled UPS maintenance

Define the next maintenance visit.

Scope to confirm
Inspection, operating readings, battery checks and findings against the previous visit.
Have ready, if known
UPS model and rating, last report, battery age and permitted service window.

Battery testing or replacement

Investigate declining runtime or plan a string replacement.

Scope to confirm
Ohmic trends, capacity testing where specified, replacement scope and disposal requirements.
Have ready, if known
Battery model, number of strings, installation date and required runtime.

A maintenance contract

Set the visits, reports and response terms in writing.

Scope to confirm
Equipment schedule, preventive visits, battery scope, parts and call-out terms.
Have ready, if known
Equipment list, existing agreement, access hours and reporting requirements.

A load bank test

Check the power train under a defined artificial load.

Scope to confirm
Connection point, load steps, hold times, transfers and recorded output readings.
Have ready, if known
UPS rating, single-line diagram, bypass arrangement and test window.

Installation and commissioning

Prepare a documented handover for a new or moved UPS.

Scope to confirm
Site checks, startup procedure, functional tests and acceptance records.
Have ready, if known
Model, electrical supply, room access, load and target commissioning date.

Replacement planning

Assess an ageing system before committing to its replacement.

Scope to confirm
Equipment condition, support status, load, redundancy and replacement constraints.
Have ready, if known
Equipment inventory, recent faults, load profile and planned growth.

Thermography and power quality

Investigate hot connections or supply disturbances.

Scope to confirm
Infrared findings and power-quality measurements within an agreed scope.
Have ready, if known
Symptoms, circuit information, operating load and previous readings.

Key facts

Why maintenance pays:
UPS receiving two preventive maintenance visits a year have an MTBF 23 times higher than UPS with none, per Vertiv's reliability analysis

4 h Reply and quote: within 4 business hours

Same day Same day: Montreal, Quebec City, Toronto, Ottawa

24 to 48 h Elsewhere in Canada: 24 to 48 hours

24/7 Emergency line: 24/7

What a UPS service programme covers

A UPS service programme covers scheduled maintenance, battery testing and replacement, thermal and power-quality checks, load testing, repairs and, at the end of the UPS's life, a planned replacement. Eaton lists the components that need preventive maintenance: batteries, capacitors, air filters, internal connections and power supplies. Each wears on its own schedule, and Eaton's aging-UPS paper names the most common causes of failure: dirt and dust, humidity and heat.

From request to report

  • Request: you send the site, the UPS make and size and the timing; we reply and quote within 4 business hours.
  • Method: before the visit, a written method: what is checked, which readings are taken, how the load is protected, who signs off.
  • Visit: the work is done to the maker's procedure for your model, with readings recorded as they are taken.
  • Report: what was found, what was done, readings against the previous visit, and what needs attention next, with photos.

Explore three-phase UPS models

APC, Eaton, Vertiv and XPC. Match your nameplate to a researched family, then plan maintenance or replacement.

Browse the model library

Services

Questions

Which UPS brands are covered?

Three-phase UPS from the main makers, including Eaton, Schneider Electric (APC), Vertiv (Liebert), Mitsubishi Electric, Toshiba, Delta, Socomec, ABB and Xtreme Power Conversion. Brand names identify the equipment only; we are not the manufacturer.

How fast can someone be on site?

On the same day in Montreal, Quebec City, Toronto or Ottawa; elsewhere in Canada, within 24 to 48 hours. Emergency calls are answered at any hour.

Do I get a report after every visit?

Yes. Every visit ends with a written report: findings, readings, work done and recommendations.

Sources, checked 2026-10-04:

Need a UPS serviced, tested or replaced?

Tell us the site, the UPS and the timing. We reply and quote within 4 business hours, or call 1 (438) 800-0382

Get a quote in 4 business hours
Call 1 (438) 800-0382Get a quote