UPS installation and commissioning

Commissioning proves that a newly installed UPS works as designed before it carries the critical load: start-up to the maker's procedure, functional checks of every operating mode, a load test, battery checks, and a handover file with the results.

Equipment illustration

Installation and commissioning

Prepare a service request

Prepare a documented handover for a new or moved UPS.

Scope to confirm

Site checks, startup procedure, functional tests and acceptance records.

Have ready, if known

Model, electrical supply, room access, load and target commissioning date.

Send what you know. The equipment and access details can be confirmed after the first contact.

Get a quote for this workUse the form below

Key facts

Start-up and warranty:
Eaton defines product start-up as performed by an Eaton Customer Service Engineer or agent; parts warranty outside the U.S. runs 12 months from start-up or 18 months from shipment
Permits in Ontario:
Almost all electrical work needs a notification of work filed with the Electrical Safety Authority Electrical Safety Authority (Ontario)
Load test steps:
50% load for one hour, then 100% for 3 hours, in Eaton's UPS load bank method
Fresh batteries:
A freshening charge and a float period before a load test, when the test falls within the maker's window (C&D)

4 h Reply and quote: within 4 business hours

Same day Same day: Montreal, Quebec City, Toronto, Ottawa

24 to 48 h Elsewhere in Canada: 24 to 48 hours

24/7 Emergency line: 24/7

How Is a New Data-Centre UPS Commissioned?

What commissioning proves

Short answer

Commissioning proves that the whole installed system does what the design says: the UPS starts, transfers, carries the load at its rating, runs on battery, returns to normal and raises its alarms. ASCO's load bank paper describes acceptance and commissioning testing as verifying that a new system will perform as designed, and for a UPS the question is its ability to perform at differing power outputs and for how long.

Fig. 1 · Commissioning, from drawings to handover

Commissioning, from drawings to handoverEight steps in order: site and drawing review; placement, cabling and battery installation checked; start-up to the maker's procedure; functional tests of every mode and transfer; alarm and communication tests; load test at the maker's steps; battery baseline readings; handover.Site and drawingreviewPlacement, cabling,batteries checkedStart-up to themaker's procedureFunctional tests ofevery modeAlarm andcommunication testsLoad test at themaker's stepsBattery baselinereadingsHandover
Commissioning proves the whole installed system; the handover file records each step.

From delivery to handover

  1. What happensSite and drawing review before delivery
    What is recordedClearances, ventilation, cabling and permit status
  2. What happensPlacement, cabling and battery installation checked
    What is recordedTorque, polarity and installation checks
  3. What happensStart-up to the maker's procedure
    What is recordedSettings and start-up record
  4. What happensFunctional tests of every mode and transfer
    What is recordedEach transfer and its result
  5. What happensAlarm and communication tests
    What is recordedAlarms received by the people who need them
  6. What happensLoad test at the maker's steps
    What is recordedReadings at each stepany finding
  7. What happensBattery baseline readings
    What is recordedPer-block reference values
  8. What happensHandover
    What is recordedThe handover file and the maintenance schedule

Commissioning report

Report layout, example

Site
UPS
Date
Method
Step% loadDurationVAHz°C
FindingsOKWatchAct

Report layout, example. Values are recorded on site.

  • Installation: Clearances, cabling, torque and polarity checks
  • Start-up: The settings and the start-up record, to the maker's procedure
  • Tests: Each transfer and alarm test with its result, and the readings at each load step
  • Handover: Battery baseline values per block and the maintenance schedule

Start-up and warranty

The maker's warranty decides who starts up a new UPS. Eaton, for example, defines start-up of its 93PM and 9395 families as performed by an Eaton Customer Service Engineer or agent, and starts the parts warranty from that date. Read the warranty terms before booking the installation, and plan commissioning around the approved start-up. Electrical work also needs its permits: in Ontario, the Electrical Safety Authority says almost all electrical work requires a notification of work.

Commissioning tests

  • Pre-start checks: installation, cabling, torque, ventilation, clearances and the battery installation against the drawings and the manual.
  • Start-up: to the maker's procedure, with settings recorded.
  • Functional tests: each operating mode and transfer: normal, battery, static bypass, maintenance bypass, return.
  • Alarm and communication tests: every alarm the site relies on, reaching the people who need it.
  • Load test: the UPS at known load steps on a load bank, or with the UPS's own test function where the maker provides one.
  • Battery baseline: readings on every block, as the reference for every later visit.

Load test on a new UPS

The load test puts the UPS output on a load bank before the critical load is connected, at the steps the maker's method sets; Eaton's UPS method runs 50% load for one hour and 100% for 3 hours, then a short battery discharge and repeated transfers. Some large UPS can test themselves: Vertiv's safe capacity test circulates power inside the Liebert Trinergy Cube and EXL S1 during start-up and commissioning, without an external load bank. New batteries need care before a discharge: C&D calls for a freshening charge and a float period before a load test within its stated window. The full method is under load bank testing.

Once every system on a new site has passed its own tests, the integrated systems test runs them together.

The handover file

  • As-installed drawings and the equipment list with serial numbers.
  • Start-up record and settings.
  • Functional, alarm and load test results.
  • Battery baseline readings for every block.
  • Warranty terms, the start date and the maintenance schedule that keeps it valid.
  • Open items and who closes them.

Installation across Canada

We install and commission three-phase UPS for data centres, server rooms and industrial sites, working to each maker's procedures and with the site's electrical contractor. For sizing before you buy, see UPS sizing; for installation and start-up, see UPS consultation, sales and installation.

Questions

Can commissioning be done without a load bank?

On some large UPS with a built-in test function, yes; otherwise a load bank is the way to prove the UPS at known load before it carries the critical load.

Does the warranty depend on the start-up?

Usually. Makers tie the warranty to an approved start-up; check the terms for your model before the installation date.

Do I need a permit to install a UPS?

Almost always for the electrical work. In Ontario, the Electrical Safety Authority requires a notification of work for almost all electrical work; other provinces have their own rules.

How long does commissioning take?

It depends on the size of the system and the tests in the method; a load test alone takes several hours.

Sources, checked 2026-10-04:

Need a UPS serviced, tested or replaced?

Tell us the site, the UPS and the timing. We reply and quote within 4 business hours, or call 1 (438) 800-0382

Timing

We reply and quote within 4 business hours.

More details
Call 1 (438) 800-0382Get a quote