A data-centre UPS turns incoming AC into DC, keeps a battery charged on that DC bus, and turns the DC back into clean AC for the IT load. When the utility fails the battery carries the load with no break, long enough for the generator to start; when the UPS itself needs work, a bypass carries the load around it.

On this page
  1. Parts of a data-centre UPS
  2. Normal operation
  3. When the utility fails
  4. Operating modes
  5. Input current and power factor
  6. The bypass paths
  7. Proving the UPS over its life

Key facts

Rectifier:
Converts incoming AC into DC and feeds the inverter Eaton
Inverter:
Rebuilds clean AC from DC; carries on from the battery when the input is out of limits Eaton
Static switch:
Moves the load to the bypass source on a severe overload or a rectifier or inverter failure Eaton
Battery role:
Carries the load from the moment the rectifier stops until the generator is online Eaton
Typical battery time:
Five to 15 minutes, extendable with external battery cabinets Eaton
Role in a data centre:
Even a Tier I site has a UPS to filter spikes, sags and momentary outages Uptime Institute

How Does a Data-Centre UPS Work?

Parts of a data-centre UPS

Short answer

A data-centre UPS has five parts: a rectifier, a DC bus with the battery, an inverter, a static switch with its bypass, and a maintenance bypass around the whole UPS.

  • Rectifier: converts the incoming AC into DC, feeding the inverter and charging the battery.
  • DC bus and battery: the battery sits on the DC side, ready to carry the inverter the moment the rectifier stops.
  • Inverter: rebuilds a clean, regulated AC output from the DC.
  • Static switch and bypass: an electronic path that moves the load to the bypass source in milliseconds.
  • Maintenance bypass: a mechanical path around the whole UPS for service, with the load on unconditioned power.

Eaton's UPS basics paper describes the chain: the input rectifier converts AC to DC and feeds the output inverter, isolating critical loads from raw utility power; if the AC input falls out of limits the rectifier shuts off and the inverter keeps going on battery; on a severe overload or a converter failure, the static switch moves the load to bypass.

Fig. 1 · Power path in a data centre

Power path in a data centreUtility and generator feed a transfer switch; the switch feeds the UPS rectifier, which feeds the inverter and charges the battery on the DC link; a static bypass runs around the rectifier and inverter; the UPS output feeds the PDU, which feeds the IT load.UtilityGeneratorTransfer switchUPSRectifierInverterBatteryStatic bypassPDUIT load
Utility and generator meet at the transfer switch. Inside the UPS, the rectifier feeds the inverter and keeps the battery charged; the static bypass (dashed) carries the load around them if the inverter cannot.

Normal operation

In normal operation the UPS converts every watt twice and keeps the battery charged. The Galaxy VS manual states the trade-off: double-conversion mode permanently creates a perfect sine wave at the output, but this also uses more electricity. In return, sags, spikes and frequency drift on the utility stop at the rectifier, and the load only ever sees the inverter. The energy cost is also why makers offer efficiency modes that run the load on the bypass while the utility is clean; see types of UPS for how those differ.

When the utility fails

When the utility fails, nothing changes at the load: the rectifier stops, the battery carries the DC bus, and the inverter keeps the output steady. The Galaxy VS manual describes it: the UPS transfers to battery operation and supports the load with conditioned power from the DC source. Eaton puts a typical UPS battery at five to 15 minutes of backup, extendable with external battery cabinets; for how long the generator takes to come online and what it must handle, see UPS and generator compatibility. The battery carries the load until the generator takes over for the rest of the outage.

Operating modes

ModeLoad is supplied byBattery available?
Double conversion (normal)The inverter, with a perfect sine wave, at the cost of more electricityYes
Battery operationThe inverter, from the DC sourceIt is in use
Requested static bypassThe bypass source, by command; returns to double conversion on a faultYes, if the utility is interrupted
Forced static bypassThe bypass source, after a UPS command or inverter offNo
Maintenance bypassThe bypass source, unconditioned, around the UPSNo
ECO modeThe static bypass while power quality is in toleranceCharged, used on transfer

The table follows the operating modes in Schneider Electric's Galaxy VS manual; other makers name them differently, but the logic is the same.

Input current and power factor

A modern UPS draws close to its rated current at a power factor near unity. Vertiv's catalogue describes active input power factor correction and low input current distortion that keep the current drawn from upstream close to the nominal output current, eliminating the need to oversize generators. Older and other designs differ: Cummins lists UPS rectifiers among the data-centre loads that create harmonics, and their filters among the loads with a leading power factor, both of which matter when a generator carries the UPS.

The bypass paths

The UPS itself needs service and can fail, so it has two bypass paths. The static bypass catches the load in milliseconds if the inverter is overloaded or a converter fails; the maintenance bypass lets the whole UPS be isolated for work while the load stays powered. In both, the load runs on unconditioned power, which is why bypass time is planned; see static and maintenance bypass.

Proving the UPS over its life

Maintenance and tests under load keep a data-centre UPS proven. A load bank test proves the power train at known steps; battery capacity tests prove runtime. The large frames that run this way are covered under three-phase UPS for mission-critical sites; for double-conversion units in rack sizes, see these APC online double-conversion UPS units.

Questions

Is there a break when a data-centre UPS goes to battery?

No. In a double-conversion UPS the inverter is already carrying the load; when the rectifier stops, the battery takes over the DC bus.

How long does a data-centre UPS run on battery?

Eaton puts a typical UPS battery at five to 15 minutes; data-centre systems are sized to bridge the generator start with margin, and external battery cabinets extend it.

What is the static bypass for?

To move the load to the bypass source almost instantly if the inverter is overloaded or a converter fails, so the load stays powered.

Does the UPS protect the load in bypass?

No. In static or maintenance bypass the load runs on unconditioned power from the bypass source, and on some UPS the batteries are not available.

Sources, checked 2026-10-04:

Need a UPS serviced, tested or replaced?

Tell us the site, the UPS and the timing. We reply and quote within 4 business hours, or call 1 (438) 800-0382

Timing

We reply and quote within 4 business hours.

More details
Call 1 (438) 800-0382Get a quote