UPS preventive maintenance
UPS preventive maintenance is a scheduled visit to the UPS and its batteries. Readings are taken and compared with the last visit, and worn parts are replaced, so a fault shows up as a drifting reading before it becomes an outage.

Equipment illustration
Scheduled UPS maintenance
Prepare a service request
Define the next maintenance visit.
Scope to confirm
Inspection, operating readings, battery checks and findings against the previous visit.
Have ready, if known
UPS model and rating, last report, battery age and permitted service window.
Send what you know. The equipment and access details can be confirmed after the first contact.
Key facts
- Effect on reliability:
- Two visits a year: UPS MTBF 23 times higher than with no visits (Vertiv reliability analysis)
- Air filters:
- Inspected every month, by Eaton's guidance
- Thermal scan and mechanical review:
- Scan every three months for hot spots; a full mechanical review of UPS and battery cabinets every year (Eaton)
- Connections:
- Battery and wiring terminals inspected and tightened at least once a year (Vertiv Liebert APM2 manual)
- Battery readings:
- Float voltage and current monthly; per-block ohmic readings quarterly; cell voltages twice a year (C&D)
4 h Reply and quote: within 4 business hours
Same day Same day: Montreal, Quebec City, Toronto, Ottawa
24 to 48 h Elsewhere in Canada: 24 to 48 hours
24/7 Emergency line: 24/7
What Does a Data-Centre UPS Maintenance Visit Check?
What a visit checks
Short answer
A visit checks the parts that wear and the conditions that wear them: batteries, capacitors, fans and filters, power supplies, internal connections, the environment around the UPS, and the alarm and event history. Eaton names the five components that most need it (batteries, capacitors, air filters, component connections and redundant power supplies), and its aging-UPS paper names the conditions that destroy them: dirt and dust, humidity and heat. Temperatures, voltages, currents, ohmic readings and the alarm log are written down at each visit and compared with the previous one.
Steps of a maintenance visit
- What happensReview the alarm and event log, firmware and configurationWhat is recordedAlarms since the last visit and what caused them
- What happensInspect the room: temperature, humidity, airflow, dustWhat is recordedReadings and anything that shortens component life
- What happensInspect and clean filters, fans and ventsWhat is recordedFilter condition and fan operation
- What happensMeasure input, output and bypass electrical valuesWhat is recordedVoltages, currents and load per phase
- What happensRead every battery block: voltage, ohmic value, terminal temperatureWhat is recordedPer-block readings against the baseline
- What happensScan connections and cabinets for heatWhat is recordedHot spots and their temperatures
- What happensCheck and tighten terminals where the maker requires itWhat is recordedConnections checked and their condition
- What happensCheck components against their service lifeWhat is recordedDates for capacitor, fan and battery replacement
- What happensConfirm alarms, status and transfer readiness before leavingWhat is recordedFinal status and the open items
Maintenance and reliability
Vertiv's reliability analysis indicates that units receiving two preventive maintenance visits a year have a mean time between failures 23 times higher than units with none. Separately, in Vertiv's analysis of battery-related outages, monitoring the battery strings on site more than doubled the MTBF compared with preventive maintenance alone. Eaton's aging-UPS paper attributes one-fourth of unplanned data-centre outages to UPS failures.
Maintenance intervals
Most critical sites plan two full visits a year, with lighter checks in between, adjusted to what the maker's manual for the model requires. Eaton's guidance sets the intervals for the parts that change fastest: air filters every month, a thermal scan for hot spots every three months, and a complete mechanical review of the UPS and battery cabinets every year. C&D's battery manual sets a similar schedule for the batteries: float voltage and current monthly, ohmic readings and terminal temperatures quarterly, individual cell voltages twice a year, and connection checks every year. Vertiv's APM2 manual requires battery and wiring terminals to be inspected and tightened at least once a year.
A maintenance contract sets this schedule in writing for each site; see UPS maintenance contracts.
Maintenance report contents
- UPS identification, firmware and configuration, and the alarm and event log since the last visit.
- Environment: room temperature and humidity, airflow, dust, and the condition of filters and fans.
- Electrical readings: input, output and bypass voltages and currents, load per phase, and the DC bus.
- Battery readings for each block: voltage, ohmic value and terminal temperature, compared with the last visit.
- Thermal findings at connections and in the battery cabinets, with temperatures.
- Components at or near the end of their service life, with a replacement plan.
- Work done, parts replaced, and open items with their priority.
Report layout, example
- Visual check and cleaning
- Filters, fans and capacitors
- Battery readings
- Connections
- Alarms and event log
- Transfer readiness
Report layout, example. Values are recorded on site.
Parts that wear out first
Eaton's aging-UPS paper gives average figures: air filters about 1 year, VRLA batteries 4 years on average, fans and capacitors outside power modules a recommended replacement at 7 years, and electronics such as power modules and control boards 10 years. Vertiv's EXM2 manual asks for parts that wear to be inspected regularly and replaced within their estimated life. The maintenance report records these dates so that each replacement can be planned; see modernization and replacement planning.
UPS of every brand
We maintain three-phase UPS from the main makers, in data centres, server rooms and industrial sites, working to each maker's procedures for the model. For brand-specific service pages and the full list of services, see data-centre UPS service; for model-level references, the three-phase UPS preventive maintenance reference covers each family's published intervals.
Questions
How long does a maintenance visit take?
It depends on the UPS size, the number of modules and battery strings, and whether the work needs the load on bypass. The written method states the expected duration before the visit.
Does maintenance need the UPS on bypass?
Some tasks do, such as work inside power cabinets; many readings do not. The method says which steps need bypass and how the load is protected while it is.
Is a load bank test part of maintenance?
Not by default. It is scheduled at commissioning, after repairs, or when the UPS has not been proven at load for a long time; see load bank testing.
What if the UPS is near the end of its life?
The report says so, with the components involved and the options: replace parts, refresh the electronics, or plan a replacement UPS.
Sources, checked 2026-10-04:
- White paper Vertiv, The effect of regular, skilled preventive maintenance and remote monitoring on critical power system reliability (white paper), p. 2
- Reference Eaton, Top five UPS components that require preventive maintenance
- White paper Eaton, Your aging three-phase UPS: when to refresh, replace or run to fail (white paper WP161005EN, October 2021)
- Manual Vertiv, Liebert APM2 user manual SL-71948, p. 124
- Manual Vertiv, Liebert EXM2 user manual SL-71070 Rev B, p. 171
- Manual C&D Technologies, msEndur II VRLA batteries installation and operating manual RS02044/0418, p. 6-25
Need a UPS serviced, tested or replaced?
Tell us the site, the UPS and the timing. We reply and quote within 4 business hours, or call 1 (438) 800-0382