What a live-room cleaning visit involves

Most data centres cannot be switched off to be cleaned, so the clean happens around equipment that stays on load. That changes what can be done and in what order. From the UPS owner's side, a visit has four parts: what is agreed before anyone arrives, the rules that protect the running equipment, the clean itself, and the checks afterwards.

Need the UPS in this room serviced? Get a quote

On this page
  1. Cleaning a live room
  2. Agreed before the visit
  3. Floor tiles, a few at a time
  4. The clean itself
  5. UPS and battery cabinets
  6. Checks after the visit
  7. Cleaning partners

Key facts

Accidental EPO activation:
A recurring cause of downtime (Uptime Institute)
Zinc whiskers:
Come loose when tiles are lifted or underfloor cables pulled (ASHRAE)
Unboxing:
New equipment unboxed outside the data centre (ASHRAE)
Battery cleaning:
Starts by disconnecting the battery, so it is not part of a live clean (EnerSys)
UPS air filters:
Inspected every month (Eaton)

Cleaning a live room

Short answer

Everything that is running stays running, so every step is judged by what it could do to the load. A dust cloud is drawn straight into the server and UPS intakes. A lifted floor tile changes the airflow under the floor and can release zinc whiskers. A cart that bumps an emergency power-off button can take down the room. Uptime Institute notes that accidental EPO activation is a recurring cause of downtime, so a clean is planned as carefully as any other work in the room.

For the UPS owner, the questions are which parts of the visit could touch the UPS, its batteries or its power path, and who watches them while the work goes on.

Fig. 1 · A live-room visit

A live-room cleaning visit, step by stepBefore: scope, tile rules, EPO buttons and alarms agreed. Tiles lifted a few at a time with a whisker check. The clean, high to low, capturing dust. UPS and battery cabinets cleaned outside only, findings reported. After: tiles back, EPO covers fitted, UPS log checked.Before: scope, tile rules, EPO buttons, alarmsTiles a few at a time, whisker checkClean high to low, dust capturedUPS and batteries: outside only, findingsnotedAfter: tiles back, EPO covers, UPS logBattery cleaning needs the battery disconnected.
  • Plan and check
  • Cleaning work
  • UPS side
The UPS stays on load throughout; anything inside the UPS or its batteries is left to UPS maintenance. Source: ASHRAE; Uptime Institute; EnerSys

Agreed before the visit

The scope, the sequence and the rules are agreed in writing at a walk-through before the visit:

  • Areas and order: which rooms, which rows, and whether the raised-floor void is included.
  • Floor tiles: how many may be open at once, and where the tile-lift checks for zinc whiskers will be done.
  • Off-limits equipment: UPS and battery cabinets are cleaned on the outside only; nothing is opened.
  • EPO buttons and switches: located, marked and, where the site allows, fitted with covers before work starts.
  • Alarms: who is told the visit is on, so a smoke or particle alarm triggered by the work is recognised for what it is.

The alarm point applies where the room has very early smoke detection: aspirating detectors are built to notice small amounts of airborne particles, so the fire alarm team should know a clean is under way; see the early warning detection guide for how those systems raise alarms.

Floor tiles, a few at a time

Floor tiles are lifted a few at a time for two reasons, airflow and whiskers. In a room cooled through the raised floor, every open tile changes where the cold air goes, and a row of open tiles can starve the equipment it was feeding. The second reason comes from ASHRAE: zinc whiskers on the underside of some steel tiles and pedestals become dislodged and airborne when tiles are disturbed during removal or when underfloor cables are pulled, and from there they can reach equipment circuits.

So tiles come up a few at a time, the void is cleaned below them, and they go back before the next ones are lifted. The tile-lift is also the moment for ASHRAE's flashlight test: standing a lifted tile on edge in a dim area and shining a light across the underside at a 45° angle shows twinkling speckles if whiskers are present. Tiles that show them are set aside for testing and replacement, not cleaned and put back; see the dust and contamination guide for what whiskers do.

The clean itself

The clean usually covers the parts of the room nobody reaches day to day: the raised-floor void and slab, the cable trays, the tops and outsides of racks and cabinets, and the floor. The work goes from high to low, so dust falls onto areas not yet cleaned, and it captures dust rather than moving it around: ASHRAE identifies dust settled on hardware as the risk, so blowing it off one surface only moves it to another.

Two rules from ASHRAE apply to the crew as much as to the site. No packaging comes into the room, because fibrous dust from cardboard and paper fouls heat sinks; supplies are unpacked outside. And nothing wet goes near equipment intakes, since dust only becomes corrosive when it absorbs moisture.

UPS and battery cabinets

UPS and battery cabinets are cleaned on their outside surfaces only. The inside of a UPS, its filters and its batteries belong to UPS maintenance. EnerSys's battery cleaning procedure starts by disconnecting the battery, which rules it out of any live clean: a disconnected string is a UPS with no battery behind it. The same manual forbids oil, solvents, detergents and ammonia on the jars and covers, so general cleaning products stay away from battery cabinets.

The cleaning crew reports what it sees: a clogged UPS filter, a dusty fan grille, white or green deposits on battery terminals. Schneider Electric's manual says not to run its on-line UPS where there is excessive dust or humidity, so a UPS sitting in visible dust is noted in the report. Those notes go to the next UPS maintenance visit.

Checks after the visit

After the visit the site checks that every tile is back in place, every EPO cover is still fitted, and no new alarm appears in the UPS event log or on the monitoring system. It is also the time for the monthly UPS air filter check Eaton asks for, since new filters last longer in a clean room.

The report should list the areas cleaned, before and after photos, any tiles set aside for whisker testing, and every UPS or battery observation passed to maintenance. Filed with the UPS records, it becomes part of the history the cleaning schedule relies on.

Cleaning partners

Live-room cleaning is delivered through specialist partners who work in running technical rooms. The UPS side, filters, fans and battery terminals, is handled during UPS maintenance; heavier build-up inside the cabinets is a job for electrical equipment dust removal.

Questions

Can a data centre be cleaned without shutting down?

Yes. A live-room clean works around equipment that stays on load, with rules for floor tiles, EPO buttons and the UPS and battery cabinets.

Are UPS batteries cleaned during the visit?

No. EnerSys's battery cleaning procedure starts by disconnecting the battery, so it belongs to UPS maintenance, not to a live clean.

Why lift only a few floor tiles at once?

Open tiles change the cooling airflow, and ASHRAE notes that lifting tiles can release zinc whiskers into the air.

Can cleaning set off the fire alarm?

It can trigger very early smoke detection, which is why the fire alarm team should know a clean is under way.

What should the report include?

Areas cleaned, photos, tiles set aside for whisker testing, and any UPS or battery observations for the next maintenance visit.

Sources, checked 2026-10-04:

Need the UPS in this room serviced?

UPS service: reply and quote within 4 business hours; same day in Montreal, Quebec City, Toronto and Ottawa; 24 to 48 hours elsewhere. 1 (438) 800-0382

Get a quote
Call 1 (438) 800-0382Get a quote