Resistive vs reactive load banks

A resistive load bank draws real power (kW) at unity power factor; a reactive load bank adds inductive or capacitive load (kVAR) so a source is tested at its full kVA rating and at a realistic power factor. Which one you need depends on what the test must prove.

Fig. 1 · Power triangle: kW, kVAR and kVA

Power triangle: kW, kVAR and kVAReal power kW on the horizontal side, reactive power kVAR on the vertical side, apparent power kVA on the hypotenuse; the angle between kW and kVA sets the power factor.Real power, kWkVARApparent, kVAPower factor = kW / kVAResistive load: kVAR is zero and kW equals kVA.
A resistive load bank draws kW only; inductive or capacitive load adds kVAR; the source must supply the kVA that combines them.

Key facts

Resistive power factor:
1.0 (unity): kW only ASCO Power Technologies
Generator kVA reached with resistive load:
Only 80% of nameplate kVA ASCO Power Technologies
Usual generator rating:
0.8 power factor ASCO Power Technologies
Inductive load:
Current lags voltage; rated in kVAR ASCO Power Technologies
Capacitive load:
Current leads voltage; simulates loads typical of computer and UPS equipment ASCO Power Technologies
Reactive setting on a self-testing UPS:
Up to 120% of apparent power, lagging or leading, on Vertiv's safe capacity test

Resistive, Reactive or Combined Load Bank: Which One?

Resistive and reactive load

Short answer

Resistive load turns current into heat with voltage and current in step, so all of it is real power; reactive load stores and releases energy in a magnetic or electric field, so current runs out of step with voltage. ASCO's paper describes inductive reactance as resisting a change in current, making current lag voltage (motors, transformers and chokes behave this way), and capacitive reactance as resisting a change in voltage, making current lead it. A test with resistive load only does not show the source at the power factor it will see in service.

Load bank types compared

ResistiveInductiveCapacitiveCombined
Power factorUnityLaggingLeadingChosen
Rated inkWkVARkVARkVA
Used alone?YesWith a resistive unitWith a resistive unitYes
Decision checkTypical useEngines, UPS, power systems at kW ratingGenerators and transformers at full kVALeading loads such as IT and UPS equipmentGenerators at rated power factor, parallel systems, switchgear

Reactive load and generator kVA

A generator is rated in kVA at a lagging power factor, and resistive load cannot draw the reactive part of that rating. ASCO notes that resistive load fully exercises the engine, its cooling, fuel and exhaust at 100% of nameplate kW, but brings the set to only 80% of nameplate kVA; testing the alternator to its rating needs a combined load bank at the set's rated power factor, which in most cases is 0.8. Generac draws the same line between a 1.0 resistive test and a 0.80 reactive test.

Reactive load also matters when generators run in parallel: ASCO notes that loading the reactive component is usually required to calibrate load sharing and voltage regulation.

Load type for a UPS test

The load type for a UPS test depends on the UPS and on the question being asked, so the written method sets it. ASCO lists UPS systems among the uses of resistive and reactive load banks, and notes that capacitive load banks simulate the electronic loads typical of computer and UPS equipment. Some large UPS test themselves at a set real and reactive power: Vertiv's safe capacity test lets the engineer set active power up to 120% of the UPS's maximum active power and reactive power within plus or minus 120% of its apparent power, lagging or leading, without an external load bank.

For the UPS load bank method as published, see procedure and requirements.

ISO 8528 performance classes

ISO 8528 part 6 defines functional and acceptance load bank tests for engine-driven generating sets, with acceptance classes for each. ASCO's paper summarises the classes: G1 for simple sets with undemanding loads, G2 broadly equivalent to commercial power, and G3 for sets powering critical loads that need stable, accurate power. Combined resistive and reactive load banks are used in factories to class a set and on site to confirm that it still meets its class.

What a reactive test adds to the record

A reactive test records power factor and kVA in addition to volts, amps, frequency and kW. ASCO notes that combined units need to monitor power factor and kVA, and that software control lets an operator store load profiles, capture transient responses and log data, so the same test can be repeated and compared over time.

Questions

Is a resistive load bank enough?

For proving an engine or a UPS at its kW rating, often yes. For proving a generator's alternator at full kVA, or tuning paralleled generators, no: that needs reactive load.

What does kVAR mean on a load bank?

Kilovolt-amperes reactive: the reactive power an inductive or capacitive load bank draws. Combined with kW it gives the kVA the source must supply.

Why are generators rated at 0.8 power factor?

Because the loads they supply, motors and transformers among them, draw reactive power. ASCO notes that combined load banks test a set at its rated power factor, in most cases 0.8.

Can a UPS be tested at a reactive load without a load bank?

Some can. Vertiv's safe capacity test lets the engineer set reactive power, lagging or leading, on the Liebert Trinergy Cube and EXL S1.

Sources, checked 2026-10-04:

Need a UPS serviced, tested or replaced?

Tell us the site, the UPS and the timing. We reply and quote within 4 business hours, or call 1 (438) 800-0382

Timing

We reply and quote within 4 business hours.

More details
Call 1 (438) 800-0382Get a quote