Electrical thermography and power quality for UPS
Electrical thermography uses an infrared camera to find connections and components running hotter than they should, while they are under load; power-quality measurement records voltage, current and harmonics at the UPS. Both are done with the UPS running and find faults that a visual inspection misses.

Equipment illustration
Thermography and power quality
Prepare a service request
Investigate hot connections or supply disturbances.
Scope to confirm
Infrared findings and power-quality measurements within an agreed scope.
Have ready, if known
Symptoms, circuit information, operating load and previous readings.
Send what you know. The equipment and access details can be confirmed after the first contact.
Key facts
- Scan interval for a UPS:
- Every three months for hot spots, with an annual mechanical review (Eaton)
- NFPA 70B (2023) infrared thermography:
- All equipment: every 12 months in condition 1 or 2, every 6 months in condition 3 Eaton
- What a scan records:
- Hot spots in UPS and battery cabinets, with the actual temperatures, and thermographs in the report Eaton
- What a power-quality meter records:
- Voltages, currents and harmonic content at the UPS output Eaton
- Why connections heat:
- Vibration from the building, construction or nearby machinery can affect internal connections (Eaton)
Thermography and Power Quality
What an infrared scan finds
Short answer
An infrared scan finds heat where there should be none: a loose or corroded connection, an overloaded conductor, a failing component or a blocked cooling path. Eaton's performance-test scope uses an infrared camera to identify hot spots within the UPS and battery cabinets that show a higher temperature than normal, notes them, records the actual temperatures for future reference, and puts the thermographs in the written report.
Steps of a survey
- What happensAgree the scope, the load at the time of the scan and the accessWhat is recordedThe written method
- What happensScan UPS cabinets, connections and battery cabinets under loadWhat is recordedThermographs and temperatures of every hot spot
- What happensCompare hot spots with similar connections and the last surveyWhat is recordedTemperature differences and their trend
- What happensLog voltage, current and harmonics at the UPS input and outputWhat is recordedPower-quality readings and any irregularity
- What happensRank findings by urgencyWhat is recordedWhat needs work now, and what can wait for the next visit
Survey report
Report layout, example
| Location | Hot spot (°C) | ΔT (°C) | Severity |
|---|---|---|---|
Report layout, example. Values are recorded on site.
- Method: The scope, the load at the time of the scan and the access agreed
- Hot spots: A thermograph and the temperatures of each one, compared with similar connections
- Power quality: Voltage, current and harmonics at the UPS input and output, and any irregularity
- Ranking: Findings by urgency: work now, or at the next visit
Why connections run hot
Connections loosen and degrade over time. Eaton notes that vibration from the building, nearby construction or machinery can affect internal connections; its aging-UPS paper adds that heat makes connections loose and brittle and speeds wear on capacitors, boards and insulation. Vertiv's APM2 manual requires battery and wiring terminals to be inspected and tightened at least once a year for the same reason. Thermography shows which terminals need it before the annual visit.
Scan intervals
Eaton recommends a scan every three months for hot spots, with a complete mechanical review of the UPS and battery cabinets once a year. NFPA 70B, which became a standard in its 2023 edition, sets infrared thermography for all equipment at 12 months in condition 1 or 2 and at 6 months in condition 3, where condition reflects the equipment's physical state, criticality and environment. Eaton's summary notes that these intervals apply only where the manufacturer gives no guidance of its own.
Power-quality readings
A power-quality check logs voltage, current and harmonic content at the UPS input and output over time. In Eaton's performance-test scope a power-quality meter records voltages, currents and harmonic content at the UPS output during the load steps, and any irregularity goes into the written report. Readings at the input show what the utility or generator supplies; readings at the output show what the protected load actually receives.
When to schedule a survey
- Before the annual maintenance visit, so connection work is targeted.
- During a load bank test, when the UPS is at full load and heat is easiest to see.
- After an alarm, a trip or a repair, to confirm nothing else is affected.
- When load is added, to see how the UPS and its distribution carry it.
- When a generator or utility change raises questions about the supply.
Survey method
Every survey follows a written method that sets the equipment in scope, the load at the time of the scan, the safe approach distances, which covers are opened and by whom on site, and what is recorded. The report includes the thermographs, temperatures, power-quality readings and recommendations, ranked by urgency. The faults a scan turns up most often are listed in common UPS maintenance mistakes.
Questions
Does a thermography scan need the UPS shut down?
No: a scan is taken with the UPS running under load, because heat only shows where current flows. Some covers must be opened, so the method sets the safe approach.
How often does NFPA 70B require infrared thermography?
In the 2023 edition: every 12 months in condition 1 or 2, every 6 months in condition 3, unless the manufacturer gives other guidance.
What is the difference between thermography and a load bank test?
Thermography finds heat at the load the site is carrying; a load bank test puts the UPS at a known load, often full load, which makes a thermal scan more telling. The two are often combined.
What does a power-quality reading tell me?
Whether the UPS is receiving and delivering clean power: voltage, current and harmonic content, with irregularities flagged.
Sources, checked 2026-10-04:
- Reference Eaton, Top five UPS components that require preventive maintenance
- White paper Eaton, Understanding 2023 NFPA 70B (white paper WP027024EN), p. 2
- Reference Eaton, Performance Testing Scope of Work, Attachment L-5 (revised 5/12/2015), p. 1-2
- Manual Vertiv, Liebert APM2 user manual SL-71948, p. 124
- White paper Eaton, Your aging three-phase UPS: when to refresh, replace or run to fail (white paper WP161005EN, October 2021)