Skip to content
1 (438) 800-0382FR FrançaisGet a quote

Home › Three-phase UPS. Know your system.

Eaton

Eaton 93PM: service and replacement planning

Family reference

The selected 250 kW frame uses modular power stages. Installed capacity and redundant capacity depend on the module configuration.

Eaton 93PM
Manufacturer image; configuration may vary.

Selected 480 V, 250 kW frame. Installed and redundant capacity depend on the modules present.

Check the frame and installed modules

Voltage variant
480 VSource 1
Published capacity
50-250 kWSource 1
Construction
Modular power stagesSource 1
Input and output
Three-phase input and outputSource 1

Choose a service or project

Record the installed configuration

Check at your site: Generation, frame, modules, bypass and exact battery cabinet.

  • Send the full model and serial number with the input and output voltages from the nameplate.
  • Record the battery arrangement, battery age and available service history.

Prepare the inputs for installation planning

Measured load, required runtime, bypass and room access are inputs to the assessment. Equipment selection requires a site electrical review.

  • For replacement planning, include measured load, expected growth and required runtime.
  • Describe the bypass arrangement and room access before installation planning.
  • Identify the protected load, available shutdown period and who can approve switching.

Choose the work to assess

Maintenance concerns the installed system. Replacement planning reviews its existing configuration and the site’s requirements.

Equipment illustration

UPS modernization and replacement planning

Assess an ageing system before committing to its replacement.

Scope to confirm
Equipment condition, support status, load, redundancy and replacement constraints.
Have ready, if known
Equipment inventory, recent faults, load profile and planned growth.
Plan replacement
Equipment illustration

UPS preventive maintenance

Define the next maintenance visit.

Scope to confirm
Inspection, operating readings, battery checks and findings against the previous visit.
Have ready, if known
UPS model and rating, last report, battery age and permitted service window.
Request maintenance

Manufacturer references

  1. Eaton Canada, 93PM 480V UPS, selected 250 kW frame

Choose the work to assess

Selected 480 V, 250 kW frame. Installed and redundant capacity depend on the modules present.

Choose a service or project

Back to all three-phase UPS models

Questions

Does this range describe the installed capacity?

The published range describes selected family variants. The nameplate and site configuration identify the installed system.

What should I send for the assessment?

Send the full model, voltages, battery arrangement and service history. For replacement, add measured load, required runtime and bypass details.

Need a UPS serviced, tested or replaced?

Tell us the site, the UPS and the timing. We reply and quote within 4 business hours, or call 1 (438) 800-0382

Confirm the exact model and voltage from your nameplate.

Timing

We reply and quote within 4 business hours.

More details
Call 1 (438) 800-0382Get a quote