Xtreme Power Conversion (XPC)
XPC E91: service and replacement planning
Family reference
A fixed-capacity online UPS with internal VRLA batteries. This reference covers E91-10K, E91-15K and E91-20K.
Manufacturer image; configuration may vary.Selected 10-20 kW reference: E91-10K, E91-15K and E91-20K at 208Y/120 V.
Confirm the 10K, 15K or 20K model
- Input and output
- Three-phase input and outputSource 1
Choose a service or project
Scheduled UPS maintenanceScope and preparation
- Scope to confirm
- Inspection, operating readings, battery checks and findings against the previous visit.
- Have ready, if known
- UPS model and rating, last report, battery age and permitted service window.
Read the service methodInstallation and commissioningScope and preparation
- Scope to confirm
- Site checks, startup procedure, functional tests and acceptance records.
- Have ready, if known
- Model, electrical supply, room access, load and target commissioning date.
Read the service methodReplacement planningScope and preparation
- Scope to confirm
- Equipment condition, support status, load, redundancy and replacement constraints.
- Have ready, if known
- Equipment inventory, recent faults, load profile and planned growth.
Read the service methodRecord the installed configuration
Return to my request
Check at your site: Exact model, internal batteries, external cabinets and bypass access.
Prepare the inputs for installation planning
Measured load, required runtime, bypass and room access are inputs to the assessment. Equipment selection requires a site electrical review.
Choose the work to assess
Maintenance concerns the installed system. Replacement planning reviews its existing configuration and the site’s requirements.
Equipment illustrationAssess an ageing system before committing to its replacement.
- Scope to confirm
- Equipment condition, support status, load, redundancy and replacement constraints.
- Have ready, if known
- Equipment inventory, recent faults, load profile and planned growth.
Plan replacement
Equipment illustrationDefine the next maintenance visit.
- Scope to confirm
- Inspection, operating readings, battery checks and findings against the previous visit.
- Have ready, if known
- UPS model and rating, last report, battery age and permitted service window.
Request maintenanceBack to all three-phase UPS models
Questions
Does this range describe the installed capacity?
The published range describes selected family variants. The nameplate and site configuration identify the installed system.
What should I send for the assessment?
Send the full model, voltages, battery arrangement and service history. For replacement, add measured load, required runtime and bypass details.
Which E91 models are covered?
E91-10K, E91-15K and E91-20K, within the selected 10-20 kW, 208Y/120 V reference.