Home › Three-phase UPS. Know your system.
Vertiv / Liebert
Liebert EXM: service and replacement planning
Family reference
The EXM family has fixed and scalable configurations. Voltage variants have different power ranges and ancillary cabinets.
Manufacturer image; configuration may vary.Selected North American 208 V and 480 V ranges. Fixed and scalable configurations exist; confirm the installed configuration.
Identify the voltage and construction variant
- Published capacity
- 10-200 kW (208 V); 50-250 kW (480 V)Source 1
- Construction
- Modular construction; fixed or scalable configurationSource 1Source 2
Choose a service or project
Scheduled UPS maintenanceScope and preparation
- Scope to confirm
- Inspection, operating readings, battery checks and findings against the previous visit.
- Have ready, if known
- UPS model and rating, last report, battery age and permitted service window.
Read the service methodInstallation and commissioningScope and preparation
- Scope to confirm
- Site checks, startup procedure, functional tests and acceptance records.
- Have ready, if known
- Model, electrical supply, room access, load and target commissioning date.
Read the service methodReplacement planningScope and preparation
- Scope to confirm
- Equipment condition, support status, load, redundancy and replacement constraints.
- Have ready, if known
- Equipment inventory, recent faults, load profile and planned growth.
Read the service methodRecord the installed configuration
Return to my request
Check at your site: Voltage variant, installed capacity, maintenance bypass and distribution.
Prepare the inputs for installation planning
Measured load, required runtime, bypass and room access are inputs to the assessment. Equipment selection requires a site electrical review.
Choose the work to assess
Maintenance concerns the installed system. Replacement planning reviews its existing configuration and the site’s requirements.
Equipment illustrationAssess an ageing system before committing to its replacement.
- Scope to confirm
- Equipment condition, support status, load, redundancy and replacement constraints.
- Have ready, if known
- Equipment inventory, recent faults, load profile and planned growth.
Plan replacement
Equipment illustrationDefine the next maintenance visit.
- Scope to confirm
- Inspection, operating readings, battery checks and findings against the previous visit.
- Have ready, if known
- UPS model and rating, last report, battery age and permitted service window.
Request maintenanceChoose the work to assess
Selected North American 208 V and 480 V ranges. Fixed and scalable configurations exist; confirm the installed configuration.
Choose a service or projectBack to all three-phase UPS models
Questions
Does this range describe the installed capacity?
The published range describes selected family variants. The nameplate and site configuration identify the installed system.
What should I send for the assessment?
Send the full model, voltages, battery arrangement and service history. For replacement, add measured load, required runtime and bypass details.
Need a UPS serviced, tested or replaced?
Tell us the site, the UPS and the timing. We reply and quote within 4 business hours, or call 1 (438) 800-0382