Audits and planning
Data-centre infrastructure audit report
An audit report sets out what was checked, what was found and what to do about it, ranked by urgency. For the power path it covers the UPS, the batteries, the transfer switches, the switchgear and the PDUs, with measured loads and readings; findings on cooling, fire protection and cleanliness are recorded and routed to the matching specialist service. Each finding has a reason, a source and a recommended action.
Need the UPS in this room serviced? Get a quote
Key facts
- Not a certification:
- Tier Certification is reserved to Uptime Institute and is performance-based
- Readings in the report:
- Infrared hot spots and power-quality readings at the UPS output, noted in a written report (Eaton)
- Battery trend yardstick:
- Ohmic change under ±20% acceptable; over 50% needs further attention (C&D)
- Value of maintenance:
- UPS MTBF 23 times higher with two PM visits a year than with none (Vertiv)
Audit scope
Short answer
The audit covers the power path from the utility service to the rack, and the records that show how it is run. On the power side that means the UPS systems, battery strings, transfer switches, switchgear, floor and rack PDUs and the generator interface; on the records side, the single-line diagram, maintenance history, service-life notices and procedures. The Tier and redundancy checks follow the published Uptime Institute definitions. Uptime Institute describes Tier Certification as a performance-based evaluation, not a checklist, and reserves certification to itself, so the report states findings against the definitions without claiming a Tier.
How an audit runs
- What happensAgree the question, the scope and the documents availableWhat is recordedThe written scope and the list of systems
- What happensReview the single-line diagram, maintenance history and service-life noticesWhat is recordedGaps in records and equipment past its service stage
- What happensWalk the power path from the utility service to the rackWhat is recordedPaths, single points and single-corded loads
- What happensMeasure loads, battery readings and thermal images under normal operationWhat is recordedLoad per module and path, battery trend, hot spots
- What happensCheck findings against the redundancy level and the Tier definitionsWhat is recordedWhere the site falls short and why
- What happensWrite and present the reportWhat is recordedFindings ranked by urgency, with the action and cost for each
Readings in the report
Eaton's published scope for UPS performance testing records infrared scans of the UPS and battery cabinets, with the actual temperatures of any hot spot kept for future reference, and power-quality readings of voltage, current and harmonic content at the UPS output, with irregularities noted in a written report. An audit report uses the same kind of evidence: the load on each module and path, battery voltages and ohmic readings with their trend, thermal images of connections, and the UPS event logs. C&D's manual gives the yardstick used for the battery trend: changes in ohmic readings of less than ±20% are acceptable, and changes greater than 50% need further attention.
Ranking findings
Findings are ranked by what each one puts at risk and how soon. A finding that could drop the critical load today, such as a redundant pair loaded beyond one side or a hot connection on a main breaker, is ranked first and documented prominently in the report. Items that remove redundancy or shorten battery runtime come next, then items due within the next maintenance cycles, then improvements. NFPA 70B takes a similar approach for electrical equipment, setting maintenance intervals from the worst of the equipment's condition, criticality and environment, so the report's ranking and the maintenance plan use the same logic.
Findings outside the power path
Findings outside the power path go into the same report and are routed to the matching specialist service. Cooling, fire protection and room cleanliness affect the UPS directly, through heat, through what happens to the UPS room after a discharge, and through dust in the air filters, so they are recorded where they are found rather than left to a separate visit. Eaton notes that dust can block UPS air filters and shut the UPS down on overheating, so a dirty room is recorded as a UPS finding.
Maintenance history
Vertiv's analysis puts the mean time between failures of a UPS that receives two preventive maintenance visits a year at 23 times that of a unit with none. The report sets the actual history against the maker's schedule and the electrical maintenance intervals, and lists what was missed. Where a site has no maintenance contract, the report is often the basis for one; see UPS maintenance contracts.
Requesting an audit
Send the site address, the UPS and generator list, the single-line diagram if you have one, and the question the audit has to answer, such as a Tier claim to check, a capacity concern or an ageing UPS, through the audit quote request. The scope and the report format are agreed before the visit, so the report answers the question that was asked. The faults an audit finds most often are listed in the maintenance mistakes behind most UPS failures.
Questions
What is in a data-centre audit report?
The scope, the readings taken, the findings ranked by urgency, and a recommended action for each, covering the power path directly and routing cooling, fire and cleanliness findings to the matching specialist service.
Does the audit report certify a Tier?
No. Tier Certification is reserved to Uptime Institute; the report checks the site against the published definitions.
How long does an audit take?
It depends on the size of the site and the scope agreed; the visit and the report timeline are set in the written scope before the work starts.
Will the audit need a shutdown?
No. The readings are taken in normal operation; any test that needs a shutdown is recommended in the report and planned separately.
Sources, checked 2026-10-04:
- Reference Uptime Institute, Myths and misconceptions regarding the Uptime Institute's Tier Certification System
- Reference Eaton, Performance Testing Scope of Work, Attachment L-5 (revised 5/12/2015), p. 1-2
- Reference Eaton, Top five UPS components that require preventive maintenance
- White paper Eaton, Understanding 2023 NFPA 70B (white paper WP027024EN, March 2023), p. 2-5
- Manual C&D Technologies, msEndur II VRLA batteries installation and operating manual RS02044/0418, p. 6-25
- White paper Vertiv, The effect of regular, skilled preventive maintenance and remote monitoring on critical power system reliability (white paper), p. 2